Creating new offices and laboratories in 28 weeks required in-depth collaboration between Absci scientists, planners, design professionals, and the Bremik Construction team. The detailed design called for close collaboration with Bora Architects to model, source, and solve the many challenges of a compressed timeline, while planning flexible workspaces for an evolving science industry.