Warm Springs K-8 HVAC Systems Replacement
Warm Springs K-8 School project replaced its aging VRF HVAC system with a modern 4-pipe hydronic system during a fast-paced summer sprint to minimize disruption to students and staff. The project included construction of a new external boiler plant, installation of an air-cooled chiller, new 4-pipe fan coil units, associated piping infrastructure, and upgraded HVAC controls to improve system performance, reliability, and long-term energy efficiency.
- LocationWarm Springs, OR
- OwnerJefferson County School District
- ArchitectBBT Architects