Bremik has completed a variety of projects for the MAC Club over the past few years, and will continue to be a go-to contractor for future work. Bremik recently completed the 50 meter pool renovation, the rock climbing wall, and the MAC member service center.

In the basement level of the historic and exclusive Multnomah Athletic Club, Bremik and GBD Architects renovated the club’s 50M pool. Renovations included demolition of all existing pool and pool deck surfaces down to the original concrete structure, replacement and upgrades to the pool’s mechanical systems, structural repairs as necessary and installation of all new finishes inside and around the pool. In an effort to improve the indoor air quality of the existing Natatorium, a complete reconfigured design build HVAC and dehumidification system was installed, making use of the “Source Capture and Exhaust” method.